Contract for the system to manage the waste and recycling services.
- Region
- UK
- Published
- 2mo ago
Every live UK public-sector tender for cleaning, security, grounds, waste, catering, pest control and FM bundles, from Find a Tender, Contracts Finder and Public Contracts Scotland. Updated daily. Free to browse, no login required.
Results
3,114
Open now
348
Avg value
£42M
Closing in 7d
61
Contract for the system to manage the waste and recycling services.
The London Borough of Hounslow requires a provider to clean the internal and external windows of council housing stock. These buildings range from 2 storey to 22 storey blocks of flats, purpose-built units and converted houses and have a range of windows including regular size windows, floor to ceiling units, glazed panels, skylights and light boxes. Most High-Rise blocks have tilt and turn mechanisms.
WLWA is tendering on behalf of the six London Boroughs (Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond) for a Rubble, Hardcore and Soil processing Contract, commencing on Saturday 12th September 2026. The Contract will be between WLWA and the successful bidder only, with WLWA acting for and on behalf of the Boroughs. The Contract Material will arise within the West London administrative area, predominantly from the six Household Reuse and Recycling Centres (HRRCs) as listed in Annex 2 - Specification. Each HRRC has a designated 20 cubic yard or 40 cubic yard container for residents and small traders to segregate and dispose of their Rubble, Hardcore and Soil material, with a number of sites covering the container to control potential contamination entering the waste stream. When these designated containers are full, five of the HRRCs contact the WLWA procured Roll On - Roll Off (RoRo) haulage contractor to collect the full container, and replace with an empty container. The full container will then be delivered to the Contractors Processing Facility for treatment and onward disposal. One of the HRRCs (Space Waye - London Borough of Hounslow) operates it's own RoRo vehicle, and as such, would deliver the Contract Material to the Processing Facility using their own haulage arrangements. The Contractor will be responsible for: • The acceptance and processing of Rubble, Hardcore and Soil material delivered to the Contractors Processing Facility; • Any onward treatment and transport of the processed Contract Material to the end markets/users; • Ensuring Zero Waste to Landfill for the Contract Material delivered to the Processing Facility Contract Material shall be Rubble, Hardcore and Soil materials arising within the West London Administrative Area, delivered to the Contractors Processing Facility. The current quantities of Contract Materials are stipulated in Annex 2 - Specification for each of the HRRCs where the material will predominantly arise, and will be approximately 5,300 tonnes per annum. two.2.5) Award criteria
Direct award under the CCS - Vertical Applications Solutions Framework (RM6259) two.2.5) Award criteria
For the provision security services at Western International market. Further details to follow.